01-5111093 info@divyajyotihydero.com
50 MW Marsyangdi Besi Hydroelectric Project
Clean energy for a brighter Nepal

50 MW Marsyangdi Besi Hydroelectric Project

Our flagship 50 MW run-of-river hydropower project is being developed on the Marsyangdi River in Besisahar Municipality, Lamjung District.

Powering Nepal’s Sustainable Future
Clean energy for a brighter Nepal

Powering Nepal’s Sustainable Future

Divya Jyoti Hydropower Limited is developing the 50 MW Marsyangdi Besi Hydroelectric Project in Lamjung, contributing clean and reliable renewable energy to Nepal’s national grid.

Harnessing the Power of Nature
Clean energy for a brighter Nepal

Harnessing the Power of Nature

By utilizing Nepal’s abundant water resources responsibly, we aim to generate clean electricity while supporting communities, infrastructure and long-term economic development.

Building Energy for Generations
Clean energy for a brighter Nepal

Building Energy for Generations

Backed by experienced promoters and a strong vision for Nepal’s power sector, Divya Jyoti Hydropower is focused on delivering efficient, environmentally responsible and dependable energy.

Project at a Glance

Key highlights of the 50 MW Marsyangdi Besi Hydroelectric Project.

View Detailed Information →
⚡50 MWInstalled Capacity
≋90 m³/sDesign Discharge (at 40.50% PeE)
▲76.79 mGross Head
●64.66 mNet Rated Head
▂322.14 GWhExpected Annual Energy Generation
⚡132 kV / 8 kmTransmission Line (to Udipur Substation)

Salient Features

Technical highlights of the project based on approved design.

Project Type
Run-of-River
Design Discharge
90 m³/s (at 40.50% PeE)
Gross Head
76.79 m
Net Rated Head
64.66 m
Turbines
Four horizontal-axis Francis turbines (13.25 MW each)
Annual Energy
322.14 GWh
Transmission Line
132 kV, 8 km (to Udipur Substation)

The project is located on the Marsyangdi River in Marsyangdi Rural Municipality, Lamjung, Gandaki Province.

Satellite map of the Divya Jyoti Hydropower Project site on the Marsyangdi River near Besishahar, Lamjung, Gandaki Province, Nepal
Construction progress

Construction Progress

Major construction works for the 50 MW Marsyangdi Besi Hydropower Project are in full swing as planned.

Settling Basin Settling BasinConstruction in progress
Hydromechanical Workshop Hydromechanical WorkshopConstruction in progress
Batching Plant Setup at Intake Batching Plant Setup at IntakeConstruction in progress
Sensor Device to monitor flood Level Sensor Device to monitor flood LevelConstruction in progress
Access Road Access RoadConstruction in progress
Learn More About Us →
About Divya Jyoti Hydropower

About Us

Divya Jyoti Hydropower Limited is a Nepalese public company established on 21 February 2008 with the objective of developing and operating hydropower projects and supplying electricity to Nepal’s national grid. The company is currently developing the 50 MW Marsyangdi Besi Hydroelectric Project, a run-of-river project located on the Marsyangdi River in Besisahar Municipality, Lamjung District, Gandaki Province. Api Power...

About Divya Jyoti Hydropower
Our purpose

Clean Energy.
Stronger Communities.

Our purpose is to develop clean, reliable, and sustainable hydropower projects that responsibly harness Nepal’s abundant water resources, strengthen national energy security, drive economic growth, and contribute to a more sustainable and prosperous future.

🌿Clean & Renewable Energy
👥Local Employment & Economic Growth
🌲Environmental Protection
🤝Community Development
Satish Neupane
Leadership message

MESSAGE FROM CHAIRMAN.

Our Team →
“

As the Chairman of Divya Jyoti Hydropower, I am proud to lead a company committed to harnessing Nepal’s abundant water resources for sustainable energy generation. Our flagship Marsyangdi Besi Hydropower Project reflects our vision to contribute to the nation’s energy independence, drive economic growth, and support environmental stewardship. With a dedicated team and strategic partnerships, we are determined to deliver reliable, clean power that benefits communities today and for generations to come.

Satish Neupane Chairman
Community Impact

Growing Together with Our Communities

We believe in creating long-term positive impact through education, infrastructure support and local development initiatives.

📖Education SupportComputer support to local schools
🏗️InfrastructureRoad construction and upgrading
❤️Community WelfareHealth and social support programs
Media

HIGHLIGHTED FEATURES.

View All Videos →


Divyajyoti Hydropower Secures Financial Closure for 50 MW Marsyangdi Besi

Questions & answers

FREQUENTLY ASKED QUESTIONS.

What is the design discharge of the Marsyangdi Besi Project?

+
The project has a design discharge of 70 m³/s, derived at approximately 49% probability of flow exceedance.

What type of turbines will be used in the project?

+
The project is designed with four horizontal-axis Francis turbine units, each rated at 13.75 MW, to generate a total installed capacity of 50 MW.

How will electricity from the project be connected to the national grid?

+
Electricity will be evacuated through an approximately 4 km long, 132 kV double-circuit transmission line connecting the project switchyard to NEA’s Udipur Substation in Lamjung.

When was Divya Jyoti Hydropower established?

+
Divya Jyoti Hydropower Limited was established on 21 February 2008 as a private limited company and was later converted into a public limited company to develop and operate power projects for supplying electricity to Nepal’s national grid.

What is Divya Jyoti Hydropower?

+
Divya Jyoti Hydropower is a Nepal-based renewable energy company that generates clean electricity from river flow and supplies it to the national grid.

Where is the project located?

+
The company is currently developing 50 MegaWatt, Marsyangdi Besi Hydroelectric Project a run off river type project in Marsyangdi river located at Besisahar Municipality, Lamjung district of Gandaki Province of Nepal.

What is your installed capacity?

+
Our plant capacity is 50 M.W