Divya Jyoti Hydropower Limited is dedicated to developing sustainable hydropower projects that harness Nepal’s natural water resources to generate reliable, clean and renewable energy.

Our Project →
Who We Are

Powering a Sustainable Nepal

Divya Jyoti Hydropower Limited is a Nepalese public company established on 21 February 2008 with the objective of developing and operating hydropower projects and supplying electricity to Nepal’s national grid. The company is currently developing the 50 MW Marsyangdi Besi Hydroelectric Project, a run-of-river project located on the Marsyangdi River in Besisahar Municipality, Lamjung District, Gandaki Province. Api Power Company Limited is the principal promoter and majority shareholder of the company, providing significant support toward the project’s equity investment and development. The project has an installed capacity of 50 MW and is designed with four horizontal-axis Francis turbines of 13.75 MW each. With a design discharge of 70 m³/s and a net head of 82.51 metres, the project is expected to generate approximately 321.535 GWh of electricity annually, including 117.890 GWh during the dry season and 203.645 GWh during the wet season. Electricity generated from the project will be transmitted through a 4 km, 132 kV double-circuit transmission line to Nepal Electricity Authority’s Udipur Substation in Lamjung. The company has completed the detailed survey, secured the required survey and generation licences, obtained IEE approval, completed land acquisition, and signed a Power Purchase Agreement with Nepal Electricity Authority on 10 Bhadra 2075. Construction of the project is currently underway.

Our Purpose

Our purpose is to develop clean, reliable, and sustainable hydropower projects that responsibly harness Nepal’s abundant water resources, strengthen national energy security, drive economic growth, and contribute to a more sustainable and prosperous future.

Our Vision

To generate and supply sustainable, reliable, and affordable electricity to support Nepal's economic growth while preserving environmental integrity.

Our Mission

To be a leading hydropower company in Nepal, recognized for innovation, sustainability, and excellence in electricity generation and supply.

Our Commitment

To our shareholders, communities, employees and all future generations through responsible and sustainable development.

Company Snapshot

Key information about Divya Jyoti Hydropower Limited.

Established21 February 2008

Later converted to a public limited company

Company TypePublic Limited Company

Nepal

Main Project50 MW Marsyangdi Besh Hydroelectric Project

Run-of-river

Major PromoterApi Power Company Limited

(Majority shareholder)

Project Location

The 50 MW Marsyangdi Besh Hydroelectric Project is located on the Marsyangdi River in Besishahar Municipality, Lamjung District, Gandaki Province, Nepal.

River
Marsyangdi River
District
Lamjung
Nearest Town
Besishahar
Province
Gandaki Province
Project location map for Marsyangdi Besh Hydroelectric Project
● Divya Jyoti Hydropower
50 MW Marsyangdi Besh

Salient Features

Key technical, hydraulic, electrical and economic features of the 50 MW Marsyangdi Besh Hydroelectric Project as per the approved project design.

View Detailed Report →
ϟ50 MWInstalled Capacity
≋90 m³/sDesign Discharge
at 40.5% PoE
▥322.14 GWhAnnual Energy Generation
(at P50)
♙132 kV / 8 kmTransmission Line
(to Udipur Substation)

▣ Project Basics

Project Name
Marsyangdi Besh Hydroelectric Project
Location
Marsyangdi Rural Municipality, Besishahar, Lamjung
Project Type
Run-of-river
River
Marsyangdi Nadi
Installed Capacity
50.00 MW
Annual Energy Generation
322.14 GWh
Catchment Area
2,888 sq. km

▤ Hydraulic & Civil Features

Gross Head
76.79 m
Net Rated Head
64.66 m
Design Discharge
90 m³/s (at 40.50% PoE)
Headrace Pipe
5.3 m diameter, 4,327.4 m length steel pipe
Surge Tank
Circular surface, 8.7 m length, 16 m breadth
Penstock Pipe
5.3 m diameter, 328 m length
Powerhouse (Size)
80 m × 14.5 m × 24.5 m
Tailrace
65 m length

♙ Electro-Mechanical Features

Turbine Type
Horizontal Francis
Number of Units
4
Capacity per Unit
13.25 MW
Turbine Efficiency
91%
Generator
Synchronous Brushless, 14.19 MVA, 97% efficiency, 1 kV
Transformer
15 MVA, 11 kV / 132 kV
Transmission Line
132 kV, 8 km (to Udipur Substation)

▥ Project Economics

Estimated Project Cost
NPR 11,300 cr.
Project IRR
14.29%
Simple Payback Period
6.51 years
Discounted Payback Period
11.13 years

The project is located on the Marsyangdi River in Marsyangdi Rural Municipality, Lamjung, Gandaki Province.

Our Journey

Key milestones in our company's journey.

1

Company Established

Divya Jyoti Hydropower Private Limited was established on 21 February 2008.

2

Converted to
Public Limited Company

Later converted to a public limited company to enable broader ownership and participation.

3

Project Development

Development of the 50 MW Marsyangdi Besh Hydroelectric Project in Lamjung.

4

Towards a Cleaner Nepal

Continuing our commitment to complete the project and contribute to Nepal's clean energy future.

Marsyangdi river valley

Building a Sustainable
Energy Future Together

We invite our partners, investors and stakeholders to join us in our journey towards a cleaner, greener and more prosperous Nepal.